PROJECT PERFORMANCE
Home » Products » PROJECT PERFORMANCE
PROJECT PERFORMANCE
Item 1  Upgrading project of a sewage treatment plant in an industrial park
  • The industrial park is dominated by calcium carbonate stone enterprises, and the production wastewater contains a large number of powder particles and high salinity. The designed treatment scale of the project is 20,000 tons/day. Previously, the sewage treatment process of "AO+diatomite+UV" was adopted. Failed to meet the discharge standards, the "hydraulic clarification tank + AO + ceramic membrane MBR" process is now used, and the effluent meets the national "Urban Wastewater Treatment Plant Pollutant Discharge Standard" (GB18918-2002) stipulated in the Class A standard.
Item 2  Sewage treatment plant in a township area
  • Mainly collect and treat domestic sewage in towns. The project adopts the core technology "AO process + ceramic membrane MBR" sewage treatment technology, with a designed treatment scale of 1,000 tons per day, and the effluent water quality index meets the "Urban Sewage Treatment Plant Pollutant Discharge Standard" (GB18918-2002) Class A standard.
Item 3  Sewage treatment plant in an industrial park
  • It mainly collects and treats industrial wastewater and domestic sewage in the stainless steel product industrial park. The project adopts the core technology "AO process + ceramic membrane MBR" sewage treatment technology, with a designed treatment scale of 5,000 tons per day, and the effluent water quality index meets the "Urban Wastewater Treatment Plant Pollutant Discharge Standard" (GB18918-2002) Class A standard.
Item 4  High-salt wastewater treatment plant in a chemical park
  • The sewage treatment plant mainly treats the production wastewater discharged by the chemical companies that produce epoxy resin, polyester resin, and TGIC water-based ink in the park. The wastewater has the characteristics of high COD and high salinity. The designed processing scale of the project is 5000 tons/day, adopting the process of "regulation + hydrolysis acidification + biochemistry + ceramic flat membrane MBR + flocculation sedimentation", and the effluent reaches the national "Urban Sewage Treatment Plant Pollutant Discharge Standard" (GB18918-2002) stipulated in Class A standard.
Item 5  Coal mine water treatment in a certain area
  • The project is designed to process 2000 tons/day and adopts the process route of "flocculation sedimentation + inclined plate sedimentation + ceramic membrane filtration". This process has a significant effect in removing particulate matter, and the turbidity reaches the standard to meet the effluent standard and realize the recycling of high-quality treated water. After long-term stable operation of membrane filtration equipment, the flux is stable at 150LMH-200LMH.
Yangzhou Kingcci Environmental Protection Technology Co., Ltd.Possess core technology and independent intellectual property rights.

CONTACT US

  +86 13375285488
  Julia@kingcci-tech.com
  1303-217 KAIFA WEST RD, YANGZHOU JIANGSU CHINA, 225127, China

SEARCH PRODUCT

© 2020KINGCCI . All rights reserved.